One of AccelAlliance Construction Management Services Corp.’s strengths is our ability to fast track construction. This 600SQM Production Hub made from prefabricated steel was done and accomplished in two weeks.

600 SQM Production Hub

This 600sqm production hub used in the manufacturing of eco cast blocks was designed and built by AccelAlliance Construction Management Services Corp. in just two weeks. Using prefabricated steel as our primary structural element, the project was done with utmost consideration on low maintenance needs, maximum storage capacity, and increased security.

We are a team of multi-disciplinary professionals working collaboratively to provide clients with strategic solutions relating to architecture, engineering and construction management.